2004-2005 Louisiana
NAPP (CIR) Project Status
2004 Louisiana NAPP (CIR) DOQQ Project:
Production Status Graphic Report

Lot 10 was shipped to all Federal Partners on
July 14, 2005
Lots 11 and 12 are in review.
2004 Louisiana NAPP CIR DOQQ Project Production
Status:

Additional Comments:
Lot 10 in review (North coverage)
Block 1 & 2 delivered.(South-coastal coverage)
2004-2005 Louisiana NAPP (CIR) Project
Staus: May 2005
The image below provides the latests DOQQ Production
status graphic for the state.

Additional Comments:
Lot 9 (Northern part of the state) is projected
for shipment in first half of June.
Lot 10 (Northern part of the state) is projected for shipment
in latter half of June.
Block 2 (Southern part of the state): Some sub-blocks have been
shipped and remaining sub-blocks are expected for shipment this
month and June.
2005-2005 Louisiana NAPP (CIR) DOQQ Production
Status:
The image below provides the latest DOQQ proudction
status graphic for the state.

Additional Comments:
Lot 8 (Northern part of the state) is projected for shipment in
April/May.
Block 3 (Coastal part of the state) is projected for shipment
in April.
2004 La. NAPP/DOQQ Project Status Report:
March 2005
Louisiana Areas North of 30 degree Latitude: (See attached pdf
file below)
Lot 7 will be shipped out by the latter part of next week.
Louisiana Areas South of 30 degree Latitude: (See
attached pdf file below)
Lot 4/last sub-block will be completed and shipped out by next
week.
2004 La. NAPP/DOQQ Project Status Report:
February 2005
Lot 7 (Area above the 30 degree latitude line
and
north of Lot 5) is in review for acceptance.

Block 4 (Area below the 30 degree latitude line
and west
of block 5-red block) status report is reported below. Each subsection
in
the block is colored to display production status for that particular
subsection.

2004 La. NAPP/DOQQ Project Status Report:
January 2005
NORTH LOUISIANA (North of 30 degree North Latitude)
2005
Lot 6 complete DOQQ shipment by January 31

COASTAL LOUISIANA (South of 30 degrees North Latitude)
2005
Block 5: Completed
Block 4: Complete DOQQ shipment by February 2005
Block 2: In Production and DOQQ Shipment by March 2005
2004 La. NAPP/DOQQ Project Status
Coastal Louisiana:

2004 La. NAPP CIR DOQQs that have been distributed
Approximately, 25% or 1/4 of the DOQQs for the state
of Louisiana are completed.
Listed below is partial shipment of La.
NAPP CIR DOQQ's, Block 5
(subblocks), containing the following quadrangles
Released with subblock 5-2 on 11-23-04
Chalmette Martello Castle Proctor Point
Belle Chase Delacroix Ysloskey
Phoenix Lake Batola Lake Cuatro Caballo
Released with subblock 5-3 on 12-01-04
Pointe aux Marchettes Lake Eugenie Oak Mound Bayou
Mitchell Island
Lena Lagoon Lake Eloi Morgan Harbor Morgan Harbor OE E
Black Bay North Lake Athanasio
Released with subblocks 5-6 and 5-1 on 12-03-04
Bay Coquette Pass Tante Phine Pilottown Pass a Loutre
West
Pass a Loutre East Pass du Bois Dixon Bay South Pass
South of South Pass
Chandeleur Light OE W Chandeleur Light North Islands
OE W
North Islands Freemason Island New Harbor Islands
Curlew Islands Grand Gosier Islands Breton Islands
Thursday, November 18th - partial shipment
of Block 5, 2004 La. NAPP CIR
DOQQ's, containing the following quadrangles.
1 Lake Laurier
2 Point A La Hache
3 Happy Jack
4 Black Bay South
5 Wilkinson Bay
6 Bay Batiste
7 Port Sulphur
8 Coquille Point
9 Taylor Pass
10 Barataria Pass
11 Bay Ronquille
12 Bastion Bay
13 Buras
14 Triumph
15 Venice
16 Main Pass
17 Grand Isle
Lot 5 (Baton Rouge area) was accepted and the DOQQ
products shipped/mailed
to the federal partners on November 8. Below are the up to date
status
graphics showing the coverage area for Lot 5 and other delivered
lots (Lot
2, 3, 4, & 5) of 2004 La. DOQQ's.
Lot 5
Other
The status information for 2004 La. DOQQ's
for Block 5 (New Orleans area)
that will be distributed in December.
The probable delivery order of the DOQs shown in
the graphic will be by the
"sub blocks" prioritized as follows:
54
52
55
53
56
51
For further clarification the legend is defined
as:
Prod---------DOQs currently in production (and will
be prepared
distribution)
Queued----DOQs not yet started, but are in the queue
Worked----Going through the AT process
The additional "sub blocks" for block
5 will be delivered as they are
addressed.
2004-2005 Louisiana NAPP/DOQQ Project
CIR DOQQ DELIVERY SCHEDULE STATUS
Louisiana Coastal Blocks/Scheduled In House (USGS-MCMC)
DOQQ Production:
South of 30 Degree Latitude
The Louisiana Coastal Blocks/Scheduled In House (USGS) Production
contains
(5)-1 degree blocks. The schedule is as follows:
The fifth delivery block of DOQQ's (Lot 5) will be delivered
December 01, 2004.
The fourth delivery block of DOQQ's (Lot 6) will be delivered
February 15, 2005.
The third delivery block of DOQQ's (Lot 7) will be delivered
April 01, 2005.
The second delivery block of DOQQ's (Lot 9) will be delivered
May 15, 2005.
The first delivery block of DOQQ's (Lot 11) will be delivered
June 01, 2005.
Louisiana DOQQ/Scheduled Aerometric-contractor Production:
North of 30
degree Latitude
Update on Lot 5 (Baton Rouge
area) re-submitted 9/04. Expected delivery
this month (October)
All estimated DOQQ deliveries are best case scenarios and
are dependent
upon CIR NAPP film acceptance and Ortho photos validation. The
best
estimate DOQQ delivery schedule is subject to change.
NAPP CIR DOQQ Production Status: 8/18/04
The first delivery block of DOQQ's (Lot 2) has been delivered
this month.
The second delivery block of DOQQ's (Lot 3) should be delivered
by August 24.
The third delivery block of DOQQ's (Lot 4) should be delivered by
August 31 or Sept. 1-3.
The fourth delivery block of DOQQ's (Lot 5) should be delivered
in September.
Graphic display of Lots 2, 3, 4, & 5.
------------------------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------------------------
NAPP CIR DOQQ Production Status: 7/15/04
The first delivery block of DOQQ's (Lot 2) is expected to be delivered
this month.
The second delivery block of DOQQ's (Lot 3) should be delivered
by the end of this month.
The third delivery block of DOQQ's (Lot 4) is scheduled for delivery
in August.
| 
|
| 
|
_________________________________________________________________________________________________
All estimated DOQQ deliveries are best case scenarios and are dependent
upon CIR NAPP film acceptance and Ortho photos passing validation.
The
best estimate DOQQ delivery schedule is subject to change.
------------------------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------------------------
NAPP CIR Film Inspection and Shipping Status: 6/16/04
NAPP CIR Film Inspections-
(1) USGS/NAPP Inspection Office, Reston, Va. has received and
inspected all 48 Rolls of NAPP CIR film.
(2) Total number of frames inspected 7,351
(3) Acceptance percentage 99.8% (actual acceptance % of total
number of frames for state of Louisiana).
(4) Only 15 frames, over insignificant areas (primarily water),
have questionable characteristics (clouds, smoke, & etc.)
representing 0.2% of total number
of frames for the state of Louisiana.
The 15 frames represent also less
than 50 flight line miles. The USGS/NAPP Inspection Office
will recommend
acceptance of the NAPP imagery
for completion of this project.
Shipping Status-
(1) All Rolls of CIR film have been shipped to EDC.
___________________________________________________________________________________________________
___________________________________________________________________________________________________
NAPP CIR DOQQ Production Status: 6/16/04
The first DOQQ delivery lot scheduled for June has been rescheduled
for delivery in July. Please note delivery schedule for
July is now comprised of Lot's 1 & 2. Therefore 2 delivery
lots (Lot 1 and Lot 2) will be delivered in July.
The reason for the delivery delay of Lot 1 is to allow contrast
enhancement (brightening up) of Lot 1-1 degree
block imagery for DOQQ processing.
BEST ESTIMATE DOQQ DELIVERY SCHEDULE:
Delivery Lot 1-1 degree block & 2-1 degree block
JULY 2004
Delivery Lot 3-1 degree block AUGUST 2004
Delivery Lot 4-1 degree block SEPTEMBER 2004
Delivery Lot 5-1 degree block OCTOBER 2004
*
Delivery Lot 6-1 degree block NOVEMBER 2004
*
Delivery Lot 7-1 degree block DECEMBER 2004
*
Delivery Lot 8-1 degree block JANUARY 2005
Delivery Lot 9-1 degree block FEBRUARY 2005
*
Delivery Lot 10-1 degree block MARCH 2005
Delivery Lot 11-1 degree block APRIL 2005 *
Delivery Lot 12-1 degree block MAY 2005
Delivery Lot 13-1 degree block JUNE 2005
Delivery Lot 14-1 degree block JULY 2005
Delivery Lot 15-1 degree block AUGUST 2005
Delivery Lot 16-1 degree block SEPTEMBER 2005
____________________________________________________________________________________________________
All estimated DOQQ deliveries are best case scenarios and are
dependent upon CIR NAPP film acceptance order and Ortho photos
passing validation.
The best estimate DOQQ delivery schedule is subject to change.
* scheduled USGS in-house DOQQ deliveries. The scheduled
USGS in-house DOQQ deliveries are for only the coastal areas of
Louisiana.
The attached gif file below displays the delivery
of Lots 5, 6, 7, 9 & 10.
| 
|
Attached below pdf file graphic displaying DOQQ location of Lot
1 & 2/1-degree blocks that will be delivered in July.
| 
|
Attached below another more detailed pdf file graphic displaying
DOQQ location of Lot 2/1-degree block that will be delivered in
July.
| 
|
NAPP CIR Film Inspection and Shipping Status: 4/21/04
NAPP CIR Film Inspections-
(1) There are a total of 48 rolls of NAPP CIR film covering
the state.
(2) USGS/NAPP Inspection Office, Reston, Va. has received
48 Rolls of
NAPP CIR film for NAPP inspection.
(3) 47 Rolls of NAPP CIR film have been inspected (smoke, high
water, color
balance, & etc.).
(4) 47 Rolls of NAPP CIR film have been inspected for area coverage
(adherence to NAPP flight line coverage guidelines such as side
lap, overlay
& etc.).
(5) Acceptance percentage 96.52% (actual acceptance of frames
not rolls).
Shipping Status-
(1) Most of (or all) all the Rolls of CIR film will
be shipped to EDC next week
_____________________________________________________________________________________________
NAPP CIR DOQQ Production Status: 4/21/04
______________________________________________________________________________________________
All estimated DOQQ deliveries are best case scenarios and are dependent
upon CIR NAPP film acceptance and Ortho photos passing validation.
The
best estimate DOQQ delivery schedule is subject to change. |